Home Training Recorded Webinars

Case Study of Complex Steel Composite Girder Bridge Analysis in Warsaw, Poland

  • 85min
  • English
  • midas Civil
  • Guest Webinar
  • 2015. 08. 26
Webinar Overview
The presentation will discuss modeling of a complex steel composite girder bridge with skew and horizontal and vertical curvatures. A case study will be presented of a railway bridge located in the capital of Poland, Warsaw. The total length of the bridge is more than 400 meters consists of 6 steel girders. The bridge is consisted of 13 spans and each span length is about 28 to 34 meters. The entire modeling and analysis process of complicated steel girder bridge project will be discussed.

Who will benefit from this webinar
• Engineers and Academics interested in design and analyse steel composite girder bridges.
• midas Civil users and learners interested in learning about how to maximize the benefit using midas Civil in steel composite bridge project.