Home Support Project Showcase

Project Showcase

  • I'm interested in
  • Kum Ga Bridge

     

  • Company

    Chung Suk Engineering, South Korea

    Software and Solution

    midas Civil
    - Construction Stage Analysis with Time-Dependent Effects
    - Cable Tension Optimization
    - Geometric Nonlinear Analysis
    - Vehicle Load Optimization

  • Bang Hwa Bridge

    The Banghwa Bridge crosses the Han River in South Korea and connects the Gangseo-gu in Seoul and Goyang in Gyeonggi Province. The bridge is a part of the Incheon International Airport Expressway. At over 2.5km in length, it is the longest bridge to cross the Han River Though mostly a girder bridge, the middle 540m section is an arch truss, resembling the shape of an airplane taking off.

  • Company

    Sam An Engineering, South Korea

    Software and Solution

    midas Civil
    - Eigen Value Analysis
    - Response Spectrum Analysis
    - Vehicle Load Optimization

  • Thuan Phuoc Bridge

    It is a suspension bridge that crosses the lower Han River at Da Nang, Vietnam. The four-lane, three-span, bridge is 1,850 meters long and 18 meters wide, and has a main span of 405 meters

  • Company

    Tecco533, CIPHanoi

    Software and Solution

    midas Civil
    - Response Spectrum Analysis
    - Eigen Value Analysis
    - Large Displacement Analysis
    - Vehicle Load Optimization"

  • Nga Tu So Flyover Bridge

    It is an extradosed bridge, which is a cross between girder bridge and cable stayed bridge.

  • Company

    VINACONEX, CIPHanoi

    Software and Solution

    midas Civil
    - Construction Stage Analysis with Time-Dependent Effects
    - Response Spectrum Analysis
    - Eigen Value Analysis
    - Vehicle Load Optimization

  • Basarab Viaduct Bridge

    The Basarab Flyover Bypass connects the central rail station with the Grozavesti Bulevardul, across the Dambovita River in downtown Bucharest. The 1,479 m Long crossing consists of a 125 m long arch bridge over the river, a complex 791 m long road and tramway viaduct, and a 302 m long, 40 m wide cable-stayed bridge over the railway.
    The new link is completed by three side ramps connecting the flyover with secondary roads at ground level.

  • Company

    C&T Engineering Srl, Romania

    Software and Solution

    midas Civil
    - Nonlinear dynamic time history analysis with
    - Lead Rubber Bearing Isolators (LRB) and
    - Viscous Dampers

  • Lange Wapper Bridge

    Antwerp, Belgium

    The bridge has two asymmetrically inclined pylons and a unique horizontally curved double-deck.The use of an inclined pylon form and a high deck bending stiffness, which is different from classic cable-stayed bridge design,was questioned but it was concluded that it showed the same mechanical behavior as a classic cable-stayed bridge.

  • Company

    C+E, TUDelft

    Software and Solution

    - Construction Stage Analysis
    - Cable Tension Optimization
    - Vehicle Load Optimization