Production of maximum stresses
at the left/right sides on a transverse cross section
of a curved bridge
Production of member forces
of the structure when the maximum force occurs in
the structure subjected to moving loads
Production of various diagrams (member forces, stresses,
displacements, reactions, etc.) for reviewing analysis
results for each construction stage (Stage & Time
Step)
Provision of animations of analysis results for
each construction stage
Output for detail analysis results of a particular
section
Report on prestress losses
due to curvature and time variation
Maximum reactions and member forces
for each construction stage summarized in a table
A graph depicting prestress losses
due to 3D curvature & friction loss
Deflection & camber management
diagram for each construction
stage of an FCM bridge, produced for erection monitoring
Stress diagram at a specific stage of an FCM bridge and
stress history diagram for construction stages
Moment diagrams & a result table
for various construction
stages of a bridge constructed by ILM
Stress diagrams & a result
table for various construction stages
Graphs showing the displacements
at the end of the nose of an ILM bridge
by construction stages
A table showing reactions at piers,
abutments and bents by construction stages
Graphs showing member forces &
displacements at a particular point by construction stages