| |
|
MIDAS/Civil provides the Construction
Stage Analysis feature, which allows Creation
and Deletion of elements with varying maturities, Change
in Boundary conditions and Change in Loadings.
It is capable of carrying out analysis reflecting Erection/Dismantlement
of temporary structures, Long span bridge analysis such
as Suspension/Cable stayed bridges, Construction stage
analysis of PSC Box bridges reflecting temporary structures
and Heat of Hydration analysis based on concrete pour
sequence.
|
| |
Construction Stage Input
|
- Define each Stage based on sequential structural
changes reflecting creation/deletion of members, varying
boundary conditions, etc.
- Define timing steps (T-step)
representing the timing of loading
and unloading specific load cases within a given construction
stage, without any change in structure.
|
| |
|
|
| |
|
Generation
of Construction Stages by simply specifying duration.
Defined construction stages may be selectively deleted,
and new stages may be inserted.
|
| |
|
|
| |
|
Generation
of Construction Stages by simple activation or deactivation
of Element groups, Loading groups and Boundary condition
groups
|
Stage Tree |
- Provision of Stage Tree for systematic recognition
of entire construction stages.
- Contents of a specific construction stage may be
readily modified.
- Defined construction stages may be deleted, or new
stages may be inserted.
- Order of defined construction stages may be revised.
|
| |
|
|
| |
|
Real
time display depicting the change of structure and loading
condition for a specific construction stage relative
to Stage Tree
|
- Works Tree allows you to systematically check and
revise the structure and loading condition of a given
construction stage.
|